NOTE: We are receiving construction permit applications, plans, specifications, and other engineering documents submitted electronically. Electronic submissions are encouraged as it will minimize steps and lag-time in our project intake process. Electronic signatures are acceptable and original signatures are not required, until further notice.
- New applications: Submit all new water supply construction permit applications, including plans and specifications, to this email address (note the hyphen): watersupply-engineering@dnr.iowa.gov. Please note: construction permit application schedules must be sent as pdf attachments. Plans and specs under 25 MB may be sent as pdf attachments. For plans and specs larger than 25 MB, send as ZIP files or use other options for submission. Mail the construction permit fee and Schedule 1c as indicated below. No need to mail in hard copies of other schedules or plans and specs.
- Projects with previously assigned project manager: Email all documents directly to the project manager if you are already working with them on a project: engineering reports, construction permit applications including plans and specifications, addenda, and change orders. If you’re unsure of the project manager, ask taroon.bidar@dnr.iowa.gov or gabe.lee@dnr.iowa.gov.
Mail the Water Supply construction permit fees and Schedule-1c to the Wallace Building address:
Iowa DNR, Attn: WS Engineering Section, 502 E 9th St, Des Moines, IA 50319-0034.
Contact Taroon Bidar if you have questions on electronic submittal at taroon.bidar@dnr.iowa.gov.