The Wastewater Engineering Section receives wastewater construction permit application submittals and issues permits and approvals electronically. Construction permit applications, plans, and specifications and all other sealed, certified, and signed engineering documents submitted with electronic signatures are acceptable and original signatures are not required.

New Permit Applications and Work Record Requests: 

 Submit all new wastewater construction permit applications (along with plans and specifications) and work record requests to the following email address:

  • wastewater-engineering@dnr.iowa.gov.
  • Email attachment size is limited to 25 MB. Please use zip files or other options to submit attachments greater than 25 MB and communicate that in your email submittal.

Projects with previously assigned project manager: 

Email all documents, including design flows and loads, antidegradation alternatives analyses, facility plans, construction permit applications (including plans and specifications), addenda, and/or change orders directly to the project manager.

Project manager assignments can be found in the Water/Wastewater Permits Information System and Records Database (W/Wisard).

Construction Permit Fees: 

To make an electronic payment, proceed to the DNR Payment System and choose “Pay Wastewater Construction Permit Fee”. Fill the information on the form and follow the on-screen instructions.

Back to top

Construction Permitting Information

Construction, installation or modification of any wastewater disposal system, including sanitary sewer extensions, requires a construction permit issued by the DNR. Review of applications for construction permits is based on the criteria contained in the Iowa Wastewater Facilities Design Standards (IWFDS), the Ten States Standards, applicable federal guidelines and standards, standard textbooks, current technical literature and applicable safety standards. To the extent of any conflict between the above criteria the IWFDS shall prevail. 

A construction permit is not required for storm sewers or storm water disposal systems that transport only storm water, or for construction of a new disposal system or an extension or addition to any existing disposal system that receives only domestic or sanitary sewage from a building or housing or occupied by 15 persons or less.

Application Submittal:

Applications for a construction permit must be submitted at least 120 days in advance of the construction start date. The DNR will issue a construction permit within 60 days of receipt of a complete application or will deny the construction permit in writing unless a longer review period is required and the applicant is notified. The construction permit shall expire if construction has not commenced within one year of the permit issuance date. The DNR may grant a time extension to commence construction if it is necessary or justified.

Rules:

Applicable rules for wastewater construction permitting are located in Chapter 64 of the Iowa Administrative Code (567 IAC 64). The current Iowa Wastewater Facilities Design Standards are located on the Design Standards Webpage.

Work Record Requests:

For assignment of a construction permitting project to DNR staff, a work record request must be submitted. All new work record requests for DNR project manager assignment must be submitted to the Wastewater Engineering Section as an attachment in an email to:

  • wastewater-engineering@dnr.iowa.gov.
  • Include Work Request – Facility – Work Title in the email subject line. An automated response will be sent to the requestor acknowledging DNR receipt of the work request.

Antidegradation:

Iowa's Antidegradation Policy rule, 567 IAC 61.2(2), became effective on February 17, 2010 and was approved by EPA on September 30, 2010. When required, Antidegradation Alternatives Analyses must be completed in accordance with the rule and the Iowa Antidegradation Implementation Procedure, submitted to the Wastewater Engineering Section for wastewater construction projects, and coordinated with the Iowa DNR project manager for the specific project. Antidegradation forms, examples, and additional information can be found on the Iowa DNR Water Quality Standards Antidegradation webpage

Back to top

Permit Process Documents

Document NameRevision Date
Self-Assessment Matrix (45.5 KB) .xls New 1/12
Self-Assessment Instructions (317.78 KB) .pdf
Self Assessment Instructions (46.5 KB) .doc
New 1/12
542-0369 Work Record Request (110 KB) .xls New 11/12
Work Record Request Instructions (81.23 KB) .pdf New 11/12
Fast Track Fact Sheet (91.42 KB) .pdf New 1/12
Wastewater Lagoon Site Soil Testing Report Checklist (158.19 KB) .pdf Updated 9/14
Back to top

Permit Application Forms

Form #Document NameRevision Date
542-1258 Petition for Waiver (1.19 MB) .pdf Updated 4/24
542-3219 Sewage Treatment Agreement (781.72 KB) .pdf Updated 9/18
542-3129 Schedule A: General Information (Exhibit 11A) (1.32 MB) .pdf Updated 9/24
542-3095 Schedule B: Collection System (1.27 MB) .pdf Updated 11/15
542-3096 Schedule C: Lateral Sewer Extension (787.63 KB) .pdf Updated 11/15
542-3097 Schedule D: Trunk and Interceptor Sewer (1.15 MB) .pdf Updated 11/15
542-3098 Schedule E: Wastewater Pump Station (828.64 KB) .pdf Updated 11/15
542-3099 Schedule F: Treatment Project Site Selection (Exhibit 11B) (790.77 KB) .pdf Updated 11/15
542-3100 Schedule G: Treatment Project Design Data (Exhibit 11C) (1019.8 KB) .pdf Updated 4/20
542-3101 Schedule H1: Schematic Flow Diagram (41 KB) .doc Updated 11/15
542-3102 Schedule H2: Treatment Process Removal (135.5 KB) .doc Updated 11/15
542-3239 Schedule H3: Mechanical Plant Reliability (782.52 KB) .pdf Updated 11/15
542-3089 Schedule I: Screening, Grit Removal and Flow Measurement (793.64 KB) .pdf Updated 11/15
542-3090 Schedule J: Septic Tank System (778.77 KB) .pdf Updated 11/15
542-3091 Schedule K1: Controlled Discharge Pond (801.05 KB) .pdf Updated 11/15
542-3092 Schedule K2: Aerated Pond (814.64 KB) .pdf Updated 11/15
542-3093 Schedule K3: Anaerobic Lagoon (797.46 KB) .pdf Updated 11/15
542-3094 Schedule L: Settling Tanks (808.69 KB) .pdf Updated 11/15
542-3081 Schedule M: Fixed Film Reactor-Stationary Media (879.09 KB) .pdf Updated 11/15
542-3082 Schedule N: Rotating Biological Contactor (796.36 KB) .pdf Updated 11/15
542-3083 Schedule O: Aeration Tanks or Basins (799.92 KB) .pdf Updated 11/15
542-3084 Schedule P: Gas Chlorination (780.81 KB) .pdf Updated 11/15
542-3085 Schedule Q: Sludge Digestion and Holding (1.35 MB) .pdf Updated 11/15
542-3086 Schedule R1: Sludge Dewatering and Disposal (777.49 KB) .pdf Updated 11/15
542-3087 Schedule R2a: Low Rate Land Application of Sludge Part I (797.25 KB) .pdf Updated 11/15
542-3088 Schedule R2b: Low Rate Land Application of Sludge Part II (783.27 KB) .pdf Updated 11/15
542-3017 Project Completion Certificate (1004.03 KB) .pdf New 4/24
Back to top

Permitting Process Manual Documents

  SRF Information and resources can be found on IowaSRF.com

Form #Document NameRevision Date
  Wastewater Engineering Construction Permitting Process Manual (1.08 MB) .pdf Updated 1/14
  Wastewater Construction Permitting Process Flow Chart (80.37 KB) .pdf Updated 9/10
  Wastewater Construction Antidegradation Process Flow Chart (40.73 KB) .pdf Updated 9/10
542-0551 Exhibit 2: Project Initiation Meeting Sample Agenda (206.73 KB) .pdf Updated 2/24
542-0106 Exhibit 3: Wasteload Allocation Form and Instructions (1.23 MB) .pdf Updated 12/18
542-0575 Exhibit 4: Facility Planning Scope of Study Checklist (1.05 MB) .pdf Updated 7/17
542-0109 Exhibit 9A: Preliminary Review of Antidegradation Alternatives Analysis (1.15 MB) .pdf Updated 11/23
542-0108 Exhibit 9B: Preliminary Review of Facility Plan Checklist (910.69 KB) .pdf Updated 7/17
  Exhibit 10A: 60% Preliminary Plans & Specs Submittal - Sewers and Force Mains (51.43 KB) .pdf Updated 9/10
  Exhibit 10B: 60% Preliminary Plans & Specs Submittal - Wastewater Pumping Station (53.16 KB) .pdf Updated 9/10
  Exhibit 10C: 60% Preliminary Plans & Specs Submittal - Wastewater Treatment Facilities (59.33 KB) .pdf Updated 9/10
542-3129 Exhibit 11A: Design Schedule A (1.32 MB) .pdf Updated 9/24
542-3099 Exhibit 11B: Design Schedule F (790.77 KB) .pdf Updated 11/15
542-3100 Exhibit 11C: Design Schedule G (1019.8 KB) .pdf Updated 4/20
Back to top

Construction Permit Database

The Water/Wastewater Information System and Records Database (W/Wisard) is an online database that provides public access to information related to current and past wastewater construction projects. The purpose of W/Wisard is to track the progress of water supply and wastewater construction projects, including those being financed through the State Revolving Fund (SRF). Project searches can be conducted utilizing a number of criteria, including specific facilities or locations.

Access the Water/Wastewater Information System and Records Database (W/Wizard).

To initiate a search for a wastewater engineering project in W/Wizard, click on the "Wastewater/CWSRF Public Search" button.

Back to top