Wastewater Land Application General Information:
Wastewater land application projects that incorporate new or additional land application sites, and new or additional storage, treatment, or disposal systems are required to obtain site approval, facility plan/engineering report approval, and a land application construction/operation permit from the DNR.
A land application operation permit will be issued along with the facility plan approval for projects without additional construction, and issued along with the construction permit for projects that require a construction permit. DNR review of land application projects is based on the Iowa Wastewater Facilities Design Standards, the Ten States Standards, applicable federal guidelines and standards, standard textbooks, current technical literature and applicable safety standards, Iowa Code Section 455B.174, and rule 567 IAC Chapter 60.
Back to topLand Application Project Initiation and Permit Applications:
Work Record Request:
To initiate a land application project, submit a work record request to the Wastewater Engineering Section as an attachment in an email to wastewater-engineering@dnr.iowa.gov. Include "Work Request – Facility – Work Title" in the email subject line. An automated email response will be sent acknowledging DNR receipt of the work request.
Construction Permit Applications:
- Applications for land application permits must be submitted to the DNR at least 120 days in advance of the construction and/or operation start date. The DNR will issue permits within 60 days of receipt of a complete application or deny the permit in writing unless a longer review period is required and the applicant is so notified.
- Construction permit applications must be accompanied by a fee of $100. To make an electronic payment, proceed to https://programs.iowadnr.gov/payments and choose “Pay Wastewater Construction Permit Fee”. Fill the information on the form and follow the on-screen instructions.
Land Application Construction Permit Process Documents
Form # | Document Name | Revision Date |
---|---|---|
Work Record Request Work Record Request | New 11/12 | |
Work Record Request Instructions | New 11/12 | |
Land Application Permitting Process Manual | Updated 7/19 | |
Land Application Decision Matrix | New 9/18 | |
Land Application Process Map | New 6/17 | |
542-0822 | Land Application Checklist - Projects WITHOUT Construction Permits | New 9/18 |
542-0821 | Land Application Checklist - Projects WITH Construction Permits | New 9/18 |
542-0820 | Land Application Site Survey Report | New 11/18 |
542-0819 | Land Application Engineering Report Scope of Study Checklist | New 9/18 |
Land Application Sample Engineering Report | New 9/18 |
Land Application Construction/Operation Permit Application Forms
Form # | Document Name | Revision Date |
---|---|---|
542-1253 | NPDES Application Fee Invoice for a New Discharger | Updated 7/23 |
542-3079 | Schedule Z: Wastewater Treatment and Disposal Systems Site Selection | New 8/18 |
542-3080 | Schedule S: Wastewater Land Application | New 8/18 |
542-3129 | Schedule A: General Information | Updated 9/24 |
542-3099 | Schedule F: Treatment Project Site Selection | Updated 11/15 |
542-3100 | Schedule G: Treatment Project Design Data | Updated 4/20 |
Other Land Application Forms and Resources
Form # | Document Name | Revision |
---|---|---|
542-0818 | Land Application Annual Monitoring Report | New 9/18 |
542-0899 | Application for an Operation Permit for Emergency Land Application of Wastewater (submit to DNR Field Office) | New 8/18 |
Land Application Loading Equations | New 9/18 | |
542-0823 | Land Application Rate Calculator Land Application Rate Calculator | New 9/18 |
Land Application Useful Web Links | New 9/18 |