Wastewater Land Application General Information:

Wastewater land application projects that incorporate new or additional land application sites, and new or additional storage, treatment, or disposal systems are required to obtain site approval, facility plan/engineering report approval, and a land application construction/operation permit from the DNR. 

A land application operation permit will be issued along with the facility plan approval for projects without additional construction, and issued along with the construction permit for projects that require a construction permit. DNR review of land application projects is based on the Iowa Wastewater Facilities Design Standards (3.7 MB) .pdf , the Ten States Standards, applicable federal guidelines and standards, standard textbooks, current technical literature and applicable safety standards, Iowa Code Section 455B.174, and rule 567 IAC Chapter 60.

Back to top

Land Application Project Initiation and Permit Applications:

Work Record Request:

To initiate a land application project, submit a work record request to the Wastewater Engineering Section as an attachment in an email to wastewater-engineering@dnr.iowa.gov. Include "Work Request – Facility – Work Title" in the email subject line. An automated email response will be sent acknowledging DNR receipt of the work request.

Construction Permit Applications:

  • Applications for land application permits must be submitted to the DNR at least 120 days in advance of the construction and/or operation start date. The DNR will issue permits within 60 days of receipt of a complete application or deny the permit in writing unless a longer review period is required and the applicant is so notified.
  • Construction permit applications must be accompanied by a fee of $100. To make an electronic payment, proceed to https://programs.iowadnr.gov/payments and choose “Pay Wastewater Construction Permit Fee”. Fill the information on the form and follow the on-screen instructions.
Back to top

Land Application Construction Permit Process Documents

Land Application - Construction Permit Process Documents
Form #   Document NameRevision Date
542-0369 Work Record Request (110 KB) .xls New 11/12
  Work Record Request Instructions (81.23 KB) .pdf New 11/12
  Land Application Permitting Process Manual (418.34 KB) .pdf Updated 7/19
  Land Application Decision Matrix (510.72 KB) .pdf New 9/18
  Land Application Process Map (226.12 KB) .pdf New 6/17
542-0822 Land Application Checklist - Projects WITHOUT Construction Permits (410.29 KB) .pdf New 9/18
542-0821 Land Application Checklist - Projects WITH Construction Permits (415.47 KB) .pdf New 9/18
542-0820 Land Application Site Survey Report (1.59 MB) .pdf New 11/18
542-0819 Land Application Engineering Report Scope of Study Checklist (1.33 MB) .pdf New 9/18
  Land Application Sample Engineering Report (56.2 KB) .docx New 9/18
Back to top

Land Application Construction/Operation Permit Application Forms

Form #Document NameRevision Date
542-1253  NPDES Application Fee Invoice for a New Discharger (943.45 KB) .pdf Updated 7/23
542-3079  Schedule Z: Wastewater Treatment and Disposal Systems Site Selection (1.34 MB) .pdf New 8/18
542-3080 Schedule S: Wastewater Land Application (1.33 MB) .pdf New 8/18
542-3129 Schedule A: General Information (1.32 MB) .pdf Updated 9/24
542-3099 Schedule F: Treatment Project Site Selection (790.77 KB) .pdf Updated 11/15
542-3100 Schedule G: Treatment Project Design Data (1019.8 KB) .pdf Updated 4/20
Back to top

Other Land Application Forms and Resources 

Form #   Document NameRevision
542-0818 Land Application Annual Monitoring Report (1.62 MB) .pdf New 9/18
542-0899    Application for an Operation Permit for Emergency Land Application of Wastewater (submit to DNR Field Office)New 8/18
  Land Application Loading Equations (522.89 KB) .pdf New 9/18
542-0823 Land Application Rate Calculator (1.36 MB) .pdf
Land Application Rate Calculator (54.38 KB) .xlsx
New 9/18
  Land Application Useful Web Links (401.32 KB) .pdf New 9/18