Iowa DNR, Floodplain Development
Search Tips


About the DNR      DNR News      Contact Us      Site Map   

 
DNR Homepage
A-Z Topic Index
 
Flood Plain Development Program
 
Flood Plain Development Program
Guidelines and Requirements
Joint Application Form (#36)
Dam Safety Program
NFIP Coordination /
Local Flood Plain Programs
Contact the Department
Flood Plain Links
 
Off-Site Information
Elevation Certificate
NFIP Form MT-EZ
NFIP Form MT-1
Iowa DOT web site
- Drainage Areas of Iowa Streams Bulletin #7 (Report Number HR-029)
 

FLOOD PLAIN OR FLOODWAY DEVELOPMENT: WHEN APPROVAL IS REQUIRED

Pipeline Crossings

When Department Approval is Required Per IAC Chapter 71
Approval by the department for the construction, operation and maintenance of buried pipeline crossings is not required if the natural contours of the channel and flood plain are maintained. (NOTE: Approval of stream bank protection measures associated with pipeline crossings may need approval under 567-71.9(455B).) Approval by the department for the construction, operation, and maintenance of all other pipeline crossings shall be required in the following instances:

71.8(1) Rural areas. In rural areas, pipeline crossings on any river or stream draining more than 100 square miles.

71.8(2) Urban areas. In urban areas, pipeline crossings on any river or stream draining more than 2 square miles.

Application Forms, Checklists & Guidance:

Application Form(s)
*.pdf
Joint Application Form
PDF File Format
 
Application Guidance
*.pdf
N/A  
 
Application Checklist(s)
*.pdf
N/A  

Aerial photographs can be obtained online at: http://ortho.gis.iastate.edu/search.html.

 

Free Adobe Acrobat Download

State of Iowa Home | DNR Home | Site Policy   
webmaster@dnr.iowa.gov © Iowa Department of Natural Resources