Iowa DNR, Land Quality


About the DNR      DNR News      Contact Us      Site Map   

 
DNR Home
UST/LUST Home
 
Underground Storage Tanks (UST/LUST)
Iowa Licensed UST Professionals
--Permanent Closure of UST Systems
--Reporting Releases
Iowa UST Licensing Program
Certified Groundwater Professionals
Groundwater Professional Bulletin Board
Certified Labs & Analytical Methods
Compliance Inspections
Environmental Covenant / Institutional Control
Ethanol
FAQ (Frequently Asked Questions)
Field Office Contacts
Forms/Technical Resources/Manuals
General Information
Iowa LUST ARRA Project
Kaizen Corrective Action Process
Landfarming
Other Links Offsite
Plastic Water Line Survey
Proposed Rules
Staff (LUST/UST)
State UST Fund and Board
UST Administrative Rules
USTfield Projects
UST Inspector's Virtual Classroom
UST System Database
Web Site Map
 
Environmental Services Division Program Areas
Air Quality
Animal Feeding Operations
Contaminated Sites
Emergency Response Unit
Field Services
Legal Services
Waste Management
Water Quality
Water Supply



Quality Control/Quality Assurance Procedures

The quality control/quality assurance (QC/QA) procedures used during the site investigation must be at least as stringent as those contained in the IDNR's Leaking Underground Storage Tank Quality Assurance Plan.  Copies of IDNR's Leaking Underground Storage Tank Quality Assurance Plan may be obtained by calling 515/242-6492.  The groundwater professional must be able to provide IDNR with copies of the QC/QA plan designed for the site, field notes and chain of custody forms on request.

Documents

*.pdf

Quality Assurance Plan 1992, 11/05/2008

PDF File Format

 

Free Adobe Acrobat Download

State of Iowa Home | DNR Home | Site Policy   
webmaster@dnr.iowa.gov © Iowa Department of Natural Resources  

Share our similarities, celebrate our differences.