Iowa DNR, Land Quality


About the DNR      DNR News      Contact Us      Site Map   

 
DNR Home
UST/LUST Home
 
Underground Storage Tanks (UST/LUST)
Iowa Licensed UST Professionals
--Removing UST Systems
--Reporting Releases
Certified Groundwater Professionals
Groundwater Professional Bulletin Board
Certified Labs & Analytical Methods
Compliance Inspections
Environmental Covenant / Institutional Control
Ethanol
FAQ (Frequently Asked Questions)
Field Office Contacts
Forms/Technical Resources/Manuals
General Information
Iowa LUST ARRA Project
Iowa Installer Licensing Program
Kaizen Corrective Action Process
Landfarming
Other Links Offsite
Plastic Water Line Survey
Proposed Rules
Staff (LUST/UST)
State UST Fund and Board
UST Administrative Rules
USTfield Projects
UST Inspector's Virtual Classroom
UST System Database
Web Site Map
 
Environmental Services Division Program Areas
Air Quality
Animal Feeding Operations
Contaminated Sites
Emergency Response Unit
Field Services
Legal Services
Waste Management
Water Quality
Water Supply



Cathodic Protection System

Cathodic Protection System Inspection Form and Memo

Underground storage tanks and piping constructed with steel or other metal in direct contact with the soil must be protected from corrosion with a cathodic protection system. This includes piping steel flex connectors in contact with the soil.

These cathodic protection systems are required to have a complete inspection every three years by a qualified cathodic protection tester. The Cathodic Protection System Inspection Report form must be used by the tester to record the results of the system inspection. The form and the testers report must be kept as part of the records and be available for review by DNR inspectors.

Chart for Recording Ampere and Voltage Meter Readings on Rectifiers

Tank owners/operators with an impressed current cathodic protection system are required to read the ampere and voltage meters on the rectifier at least every 60 days. These readings must be kept as part of the site’s records and made available to the cathodic protection inspector for the three year system test. This chart may be used to record the rectifier readings.

You will need Adobe Acrobat Reader installed on your computer to view the .pdf file. Click on the icon at the bottom of this screen to download Acrobat Reader. The .doc files are Word 97 documents and may be completed electronically.

Documents

*.doc

*.pdf

Cathodic Protection System Memo

Word Format

PDF File Format

Cathodic Protection System Inspection Form

Word Format

PDF File Format

Chart for Ampere and Voltage Meter Rectifier Readings

Word Format

PDF File Format

 

Free Adobe Acrobat Download

State of Iowa Home | DNR Home | Site Policy   
webmaster@dnr.iowa.gov © Iowa Department of Natural Resources  

Share our similarities, celebrate our differences.