Iowa DNR, Animal Feeding Operations


About the DNR      DNR News      Contact Us      Site Map   

 
DNR Homepage
A-Z Topic Index
 
AFO Home
Overview
AFO Rules
- New Rules
Contact us
AFO Site Map
 
Confinements
Current Requirements
Construction Requirements
 
Open Feedlots
Current Requirements
Construction Requirements
Manure Handling & NMPs
 
Combined Operations
NPDES Permits
 
Manure Management
Manure Management Plans
Manure Control
Applicator Certification
MMP Annual Report Due Dates
 
Publications
Forms
Fact Sheets
 
Additional Information
Meeting Notes
Maps
Statistics
Dead Animal Disposal
Emergency Spills & Fish Kills
On-Site Links
Low-Interest Loan Program
 
Pre-construction Requirements for Below-permit-sized Operations

Pre-construction requirements for confinement feeding operations with an animal unit capacity from 501 to 999 animal units and that use formed manure storage.

Non-permitted, Formed Manure Storage - A construction permit is not required. However, a Construction Design Statement (CDS) including a manure management plan must be submitted at least 30 days prior to the start of construction, even if a manure management plan has been filed before. Some construction requirements and design standards must be met. For specific requirements, see the following:



 

Free Adobe Acrobat Download

State of Iowa Home | DNR Home | Site Policy   
webmaster@dnr.iowa.gov © Iowa Department of Natural Resources  
Share our similarities, celebrate our differences.