Search for a News Release
DNR News Releases
Archive by category: Air QualityReturn
RSS
Additional SLEIS Training Session to be Held in Cedar Rapids

Additional SLEIS Training Session to be Held in Cedar Rapids

  • 1/21/2016 4:55:00 AM
  • View Count 1913
The DNR has placed the State & Local Emissions Inventory System (SLEIS) into production. SLEIS is the DNR’s new online emissions inventory reporting system. It contains four years of emissions data from SPARS (2011 – 2014), allows for simpler and streamlined reporting, and also offers the option of importing emissions data via a spreadsheet template, significantly reducing data entry for facilities with a large number of emission processes.
Opportunity to Submit Air Quality Client Contact Meeting Agenda Items

Opportunity to Submit Air Quality Client Contact Meeting Agenda Items

  • 1/21/2016 3:19:00 AM
  • View Count 1467
The Air Quality Bureau is accepting agenda topics for the next Air Quality Client Contact Meeting. The next meeting is scheduled for February 18 at 1:00 p.m., at the DNR’s Air Quality Bureau Office. A conference call option is also available for the meeting.
Environmental Protection and Natural Resources Commissions Will Meet Jointly January 20

Environmental Protection and Natural Resources Commissions Will Meet Jointly January 20

  • 1/15/2016 5:29:00 AM
  • View Count 1808
DES MOINES – The Environmental Protection Commission and the Natural Resources Commission, both of the Iowa Department of Natural Resources, will meet jointly Wednesday, Jan. 20 at 10 a.m. at the Wallace Building second floor north conference room at 502 E. Ninth St. in Des Moines. Each commission will present its annual report followed by reports of mutual interest from DNR staff.
New and Updated Air Quality Construction Permit Forms

New and Updated Air Quality Construction Permit Forms

  • 1/13/2016 8:45:00 AM
  • View Count 1761
The Environmental Protection Commission adopted rules and a fee schedule for Construction Permit application fees starting on January 15, 2016. A new form titled “Form AF: Construction Permit Application Fee” has been added to the construction permit application process. The new Form AF provides the information for minor sources to determine the correct fee to send with their application and for major sources the necessary billing and invoice remittance information.
Extension of CAP Permit Option Comment Period and Sample CAP Now Available for Review

Extension of CAP Permit Option Comment Period and Sample CAP Now Available for Review

  • 1/8/2016 5:21:00 AM
  • View Count 1897
To aid stakeholders in making comments, the DNR has developed a “Sample” Collection of Air Permits (CAP) document to provide additional clarification to applicants of what to expect in the format and language of the CAP. The information presented in the sample represents the possible permitting of a group of emission points at a facility that has a limit over several surface coating operations.
Title V Permit Application Forms Revised to Accommodate New Application Fees

Title V Permit Application Forms Revised to Accommodate New Application Fees

  • 1/7/2016 4:45:00 AM
  • View Count 2086
The Environmental Protection Commission adopted rules and a fee schedule for Title V application fees starting on January 15, 2016. Three existing Title V permit application forms have been modified to provide the DNR with the information needed for the new fee structure. Title V application Form 1.0 has been revised to include the necessary billing and invoice remittance information and Part 3 has been revised to include an application fees agreement statement.
Air Quality Fees Adopted by the Environmental Protection Commission

Air Quality Fees Adopted by the Environmental Protection Commission

  • 12/16/2015 9:40:00 AM
  • View Count 2052
The Environmental Protection Commission adopted rules and a fee schedule for asbestos notification fees and application fees for construction and operating permits during the December 15 meeting. The rules were adopted and filed emergency after notice, meaning that they will become effective today. The new fees included on the fee schedule will become effective on January 15, 2016.
New e-Reporting System – It’s here. It’s easy. It’s intuitive. It’s SLEIS

New e-Reporting System – It’s here. It’s easy. It’s intuitive. It’s SLEIS

  • 12/14/2015 10:26:00 AM
  • View Count 4456
The DNR is excited to offer a new online emissions inventory reporting tool called the State & Local Emissions Inventory System (SLEIS). The new web-based system has been pre-populated with four years of emissions data from SPARS (2011 – 2014), allowing for simpler and streamlined reporting.
Updated Permit Template Available for Comment

Updated Permit Template Available for Comment

  • 12/11/2015 7:24:00 AM
  • View Count 1662
The Air Quality Construction Permit Section is proposing to update its construction permit template. The template is the basis for the final construction permits issued by the Air Quality Bureau. These updates are aimed at providing clarity in permit requirements and at the same time providing a permit that is shorter in length.
New Construction Permit Option and Informational Meeting

New Construction Permit Option and Informational Meeting

  • 12/11/2015 6:46:00 AM
  • View Count 1712
The DNR is proposing to create a new air quality construction permit option called a Collection of Air Permits (CAP). The CAP permit will allow multiple emission points and permits to be combined into one document. The CAP permit option was developed based on recommendations from our recent dual LEAN events that included both permit applicants and DNR staff.
Air Quality Adjustments to Environmental Commission Agenda

Air Quality Adjustments to Environmental Commission Agenda

  • 12/10/2015 8:54:00 AM
  • View Count 1611
WINDSOR HEIGHTS – The agenda for the Dec. 15 Environmental Protection Commission meeting has been amended by adding fee proposals for air quality services and postponing a proposed referral on asbestos violations to a future meeting.
Give the Gift that Lasts All Year: Iowa Outdoors Magazine

Give the Gift that Lasts All Year: Iowa Outdoors Magazine

  • 12/8/2015 7:07:00 AM
  • View Count 3096
Take advantage of a special 30 percent off the regular subscription price, and give Iowa Outdoors Magazine to your friends or family this holiday season! Six issues (one-year) are just $10 and will include the 2017 calendar.
EPC to Hear Manure Management Report, Rule on Contracts

EPC to Hear Manure Management Report, Rule on Contracts

  • 12/3/2015 10:20:00 AM
  • View Count 1782
WINDSOR HEIGHTS – Commissioners will hear a presentation on manure management, and be asked to approve contracts and an air quality referral to the Iowa Attorney General, at the Dec. 15 Environmental Protection Commission meeting.
New Title V Application Completeness Review Checklist

New Title V Application Completeness Review Checklist

  • 11/30/2015 10:04:00 AM
  • View Count 1699
The DNR has a new air quality operating (Title V) permit application form – Completeness Review Checklist. The new Completeness Review Checklist is an optional tool that facilities and consultants may use when filling out a Title V permit application.
Preview Opportunity for DNR’s New Emissions Reporting System

Preview Opportunity for DNR’s New Emissions Reporting System

  • 11/20/2015 7:37:00 AM
  • View Count 3157
The SLEIS Preview Webinar previously scheduled for November 20th from 2:00 PM to 3:00 PM CST has been re-scheduled to November 24th from 10:00 AM to 11:00 AM CST due to the pending inclement weather. Please see details below to register for the SLEIS Webinar on November 24th.
New Title V EZ Mod Permit Application Form

New Title V EZ Mod Permit Application Form

  • 11/19/2015 2:24:00 AM
  • View Count 1825
The DNR has a new air quality operating (Title V) permit application form – EZ Mod Form. The new EZ Mod Form is an optional alternative to the standard Title V application forms to request a minor Title V permit modification. To reduce submitting duplicate information, this form incorporates data elements from air construction permit applications and final issued air construction permits.
Preview Opportunity for DNR's New Emissions Reporting System

Preview Opportunity for DNR's New Emissions Reporting System

  • 11/13/2015 3:27:00 AM
  • View Count 1814
The Air Quality Bureau is in its final stages of testing the State & Local Emissions Inventory System (SLEIS). SLEIS is the DNR’s new online system for businesses to submit their air emissions inventory reports. Based on the feedback we receive during November, a decision will be made as to whether to begin electronic reporting in SLEIS next year or wait until 2017.
DNR Unveils New Face to Website

DNR Unveils New Face to Website

  • 11/3/2015 8:01:00 AM
  • View Count 1841
Visitors to www.iowadnr.gov will notice a new “look and feel” to the DNR website, offering friendlier navigation and more prominent access to the information visitors want most. The DNR introduced the updated site in late October and has received positive feedback from people visiting the website.
Opportunity to Submit Air Quality Client Contact Meeting Agenda Items

Opportunity to Submit Air Quality Client Contact Meeting Agenda Items

  • 10/23/2015 9:58:00 AM
  • View Count 1734
The Air Quality Bureau is accepting agenda topics for the next Air Quality Client Contact Meeting. The next meeting is scheduled for November 19 at 1:00 p.m., at the DNR’s Air Quality Bureau Office. A conference call option is also available for the meeting.
  Opportunity to Comment on Proposed New Air Operating Permit Form

Opportunity to Comment on Proposed New Air Operating Permit Form

  • 9/28/2015 11:00:00 AM
  • View Count 1465
The DNR is proposing to implement a new air quality operating (Title V) permit application form – EZ Mod Form. The new EZ Mod Form is an optional alternative to the standard Title V application forms to request a minor Title V permit modification. To reduce submitting duplicate information, this form incorporates data elements from air construction permit applications and final issued air construction permits.
Informal Comment Period for the Draft Fee Rules and Draft Fee Schedule

Informal Comment Period for the Draft Fee Rules and Draft Fee Schedule

  • 9/1/2015 11:00:00 AM
  • View Count 1504
The Department conducted advisory group meetings with stakeholders in June and July 2015 to develop the rules and fee types and amounts to implement Senate File 488. Stakeholders continued to provide comments during the informal comment period that has been on-going since the meetings. The Department has revised the draft fee rules to incorporate changes based on the comments provided by stakeholders.
Page 4 of 4 First 123[4] NextLast